Annual Report to shareholders
Released
Released
Announcement PDF
GREEN & GOLD MINERALS LIMITED
ANNUAL REPORT
For the year ended
30 June 2026
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
1
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
Annual Report – 30 June 2026
Corporate directory 2
Directors’ report 3
Directors
Principal activities
Dividends
Review of operations
Significant changes in the state of affairs
Likely developments and expected results of operations
Tenement list
Events after reporting year
Environmental regulation
Insurance of officers and indemnities
Proceedings on behalf of the Company
Auditor’s independence declaration 23
Financial report 24
Consolidated Entity Disclosure Statement 58
Directors’ declaration 59
Independent auditor’s report to the members 60
Competent Persons Statement
The information in this announcement that relates to Exploration Results is based on, and fairly represents,
information compiled or reviewed by Mr Quentin Hill, who is a Member of the Australian Institute of
Geoscientists. Mr Hill is the Company's Managing Director and holds shares in the Company. Mr Hill has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hill consents
to the inclusion in this report of the matters based on his information and in the form and context in which it
appears.
Where the Exploration Results referred to in this Annual Report are extracted from the Company’s Prospectus
dated 8 July 2025 as noted in the text or those reported during FY2026, the Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus, and
that all material assumptions and technical parameters underpinning the exploration results in the Prospectus
continue to apply and have not materially changed.
The information in this report that relates to estimation and reporting of Mineral Resources is based on
information compiled by Mr Dean O’Keefe. Mr O’Keefe is a member of the Australasian Institute of Mining and
Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person (CP) as defined
in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the JORC Code). At the time of initial reporting Mr O’Keefe was a full-time employee of Resource Point
Pty Ltd, which specialises in mineral resource estimation, evaluation and exploration. Neither Mr O’Keefe nor
Resource Point Pty Ltd holds any interest in Green & Gold Minerals Limited, its related parties, or in any of the
mineral properties that are the subject of this report.
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
2
Corporate directory
Directors E Boulton
T Bellas
Q Hill
Company Secretary S Yeates
Principal Place of Business Level 6
179 Turbot Street
Brisbane QLD 4000
Registered Office Level 6
179 Turbot Street
Brisbane QLD 4000
Auditor Moore Australia Audit (Qld) Pty Ltd
Level 6, 10 Eagle Street
Brisbane QLD 4000
www.moore-australia.com.au
Solicitors HWLE Lawyers
Level 24, 360 Queen Street
Brisbane QLD 4000
www.hwle.com.au
Share registry MUFG Corporate Markets (AU) Limited
Level 21, 10 Eagle Street
Brisbane QLD 4000
www.mpms.mufg.com
+61 1300 554 474 or 1300 554 474 (within Australia)
Bankers National Australia Bank
Website address www.greengoldminerals.com.au
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
3
DIRECTORS’ REPORT
Your Directors present their report on Green & Gold Minerals Limited (the ‘Company’) and Controlled
Entities (‘the Group’) for the year ended 30 June 2026.
DIRECTORS AND COMPANY SECRETARY
The following persons were Directors of Green & Gold Minerals Limited during the financial year and
up to the date of this report, unless otherwise stated:
Ted Boulton
Tony Bellas
Quentin Hill
The Company Secretary is Suzanne Yeates. Suzanne was appointed to the position of Company
Secretary on 4 January 2022. Suzanne is a Chartered Accountant, Founder and Principal of Outsourced
Accounting Solutions Pty Ltd. She holds similar positions with other public and private companies.
PRINCIPAL ACTIVITIES
The principal activity of the Group during the financial year was the exploration of its Chillagoe
and Herberton assets comprising a portfolio of mining leases and exploration permits for
minerals tenements in Northwest Queensland.
No significant change in the nature of those activities occurred during the financial year.
DIVIDENDS
The Directors did not recommend the payment of a dividend. No dividend was paid during the year.
REVIEW OF OPERATIONS
The loss of the Group for the financial year after providing for income tax amounts to $886,828
(2025: loss $105,718).
FY2026 was a transformational year for Green & Gold Minerals Limited (GG1), marked by the
Company’s listing on the Australian Securities Exchange (ASX), advancement of the Mt Wandoo Gold
Project and expansion of the exploration portfolio through the acquisition of the Herberton
Conductor Metals Project.
The Company listed on the ASX on October 7th
, 2025 after an Initial Public Offering which raised
gross proceeds of $5.7 million and moved immediately into active exploration across its North
Queensland portfolio.
Chillagoe Gold Project - Mt Wandoo
Exploration during FY2026 initially focused on Mt Wandoo that hosts a 32,000oz inferred gold
resource (Table 1), in northeast Queensland. Drilling returned outstanding high-grade gold and silver
intersections, including:
• 6m at 11.1 g/t Au and 281 g/t Ag from 38m, including 3m at 19.6 g/t Au and 525g/t Ag from
41m (WBR076);
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
4
• 9m at 7.9 g/t Au and 51 g/t Ag from 59m, including 2m at 32.5 g/t Au and 210 g/t Ag
(WBR077);
• 19m at 2.9 g/t Au and 12 g/t Ag from 36m, including 2m at 24.4 g/t Au and 71 g/t Ag
(WBR085); and
• 18m at 1.9 g/t Au and 19 g/t Ag from 109m, including 8m at 3.9 g/t Au and 36 g/t Ag
(WBR084).
The drilling identified several hitherto unidentified shallow high-grade zones and resource expansion
potential at depth, within parallel structures east and west of the main mineralised trend, and to the
southeast where high-grade mineralisation remains open.
Importantly, the drilling has allowed a more detailed understanding of the deposit to direct further
exploration and highlighted the significance of silver within the Mt Wandoo system.
The Company paused an update to the mineral resource estimate in favour of additional drilling
required to better incorporate the unexpected high grade results into the resource. Focus areas for
further drilling are gaps in shallow areas of the resource adjacent to the high-grade zones identified
in the FY2026 drilling campaign and shallow extensions of the resource outside the resource area.
The Company plans to advance the development of Mt Wandoo with open pit mining studies and
investigation of both stand alone and regional processing options. In this regard, it is worth noting
that, during the year Legacy Mines Pty Ltd purchased the Mungana processing facility,
approximately 12km from Mt Wandoo, and publicly indicated support for treating third-party ore.
No processing agreement had been entered into by GG1 at year end.
Tonnes (t) Au CUT g/t Ag g/t Au CUT oz Ag oz
905,000 1.11 13.32 32,430 387,520
Table 1 : Mt Wandoo Inferred Mineral Resource Estimate (@≥0.3 g/t Au cut-off) refer GGM Prospectus dated 8 July 2025
Herberton Conductor Metals Project
A major expansion and diversification of the Company's exploration portfolio occurred through the
acquisition of Burlington Mining Pty Ltd and its Herberton Conductor Metals Project. The acquisition
was completed following shareholder approval on 16 April 2026.
The project covers numerous historic copper, silver, tin and indium mining centres located 85km
south-east of Mt Wandoo. Demand for these metals is being driven by AI, data centres and
electrification. The acquisition has positioned the company to benefit from these demand trends in
an underexplored area.
GG1's objective is to identify stand-alone bulk-tonnage copper-silver-tin resources capable of
development. Early prospecting has defined several large-scale targets, including Copper Hills, the
previously undrilled Mt Gossan breccia and the extensive Siberia lode system.
RC drilling at Copper Hills in June 2026 was designed to establish the geometry and continuity of the
mineralised system returned outstanding high grade copper, silver, tin, indium and zinc intersections
subsequent to the end of FY2026 including;
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
5
• 5m at 131 g/t Ag, 1.05% Cu, 205 g/t In, 0.37% Sn, 9.1% Zn, 1.1% Pb from 102m in CHC003,
including: 2m at 300 g/t Ag, 2.3% Cu, 421 g/t In, 0.91% Sn, 19.4% Zn, 2.3% Pb from 103m
The results give the company growing confidence that Copper Hills has the potential to develop into
a significant high-grade conductor metals discovery.
The rapid progression of the Herberton project from acquisition to drilling established as an
important second exploration focus alongside Mt Wandoo.
Regional Exploration
Regional exploration continued across the Chillagoe portfolio. At Sentinel high-tenor gold-tellurium-
bismuth veins were identified with a geochemical signature considered significant given similarities
to mineralisation at the nearby Mungana and Red Dome intrusion related gold systems.
At our Nutgrove project area in Southern Queensland, exploration identified up to 2,230 ppm heavy
rare earth oxide (HREYO) within rhyolite. The result demonstrated primary magmatic rare earth
mineralisation in addition to previously identified secondary supergene mineralisation. The
prospective Nutgrove complex extends over approximately 3km by 4km and represents a significant
large-scale exploration target.
In June 2026, the Company also entered a drill for equity agreement with Centurion Drilling that has
the potential to increase drilling capacity and preserve cash.
Outlook
GG1 finished FY2026 well funded with approximately $2.8 million cash.
In FY2027, the Company intends to continue to advance development at Mt Wandoo through
extensional drilling and assessment of potential development pathways, including ore sorting and
third-party processing.
At Herberton, drilling and systematic exploration will target the scale and continuity of
mineralisation at Copper Hills, Mt Gossan, Siberia, Penang Pekin and other prospects. Follow-up
exploration is also planned at Sentinel and Nutgrove.
GG1 enters FY2027 with an expanded portfolio, multiple drill-ready targets and a strategy to grow
shareholder value through near term gold development and exploration success while remaining
alert to commercial opportunities in an area attracting increased investment.
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
6
Tenement Status
Tenement
ID
Type
Sub-
Blocks
Grant Date Expiry Date Status Authorised Holder name
ML5130 Mining Lease N/A 19/07/1984 13/07/2026 In renewal Wandoo Tenements Pty Ltd
ML20381 Mining Lease N/A 11/03/2004 31/03/2025 In renewal Wandoo Tenements Pty Ltd
ML20234 Mining Lease N/A 24/04/2003 30/04/2027 Granted Wandoo Tenements Pty Ltd
EPM25870 EPM 1 01/12/2015 30/11/2027 Granted Wandoo Tenements Pty Ltd
EPM25927 EPM 12 28/01/2016 27/01/2026 In renewal Wandoo Tenements Pty Ltd
EPM25937 EPM 9 07/07/2017 06/09/2027 Granted Wandoo Tenements Pty Ltd
EPM26211 EPM 8 27/10/2016 26/10/2026 Granted Wandoo Tenements Pty Ltd
EPM26507 EPM 4 06/10/2017 06/10/2030 Granted Wandoo Tenements Pty Ltd
EPM27037 EPM 4 04/04/2019 03/04/2029 Granted Wandoo Tenements Pty Ltd
EPM28000 EPM 29 16/05/2022 15/05/2027 Granted Wandoo Tenements Pty Ltd
EPM28107 EPM 8 13/01/2022 12/01/2027 Granted Wandoo Tenements Pty Ltd
EPM27983 EPM 3 17/01/2022 16/01/2027 Granted Wandoo Tenements Pty Ltd
EPM27232 EPM 17 24/11/2025 23/11/2030 Granted Burlington Mining Pty Ltd
EPM27229 EPM 9 24/11/2025 23/11/2030 Granted Burlington Mining Pty Ltd
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
7
MATERIAL BUSINESS RISKS
Future capital requirements
The Company has no operating revenue and is unlikely to generate any operating revenue unless
and until a Project or Projects are successfully developed and production commences. The future
capital requirements of the Company will depend on many factors including its business
development activities. The Company believes its available cash and the net proceeds of the Public
Offer should be adequate to fund its business development activities, exploration programs and
other Company objectives in the medium term as stated in the Prospectus.
In order to successfully develop the Projects and for production to commence, the Company will
require further financing in the future, in addition to amounts raised pursuant to the Public Offer.
Any additional equity financing may be dilutive to Shareholders, may be undertaken at lower prices
than the then market price (or Offer Price) or may involve restrictive covenants which limit the
Company's operations and business strategy. Debt financing, if available, may involve restrictions on
financing and operating activities.
No assurances can be made that appropriate capital or funding, if and when needed, will be
available on terms favourable to the Company or at all. If the Company is unable to obtain additional
financing as needed, it may be required to reduce the scope of its activities and this could have a
material adverse effect on the Company's activities including resulting in the Tenements being
subject to forfeiture, and could affect the Company's ability to continue as a going concern.
Exploration and development risks
Mineral exploration and development is a high-risk undertaking. There can be no assurance that
exploration of the Projects or any other exploration properties that may be acquired in the future
will result in the discovery of an economic resource.
Exploration in terrains with existing mineralisation endowments and known occurrences may slightly
mitigate this risk.
Even if an apparently viable resource is identified, there is no guarantee that it can be economically
exploited due to various issues including lack of ongoing funding, adverse government policy,
geological conditions, commodity prices or other technical difficulties.
The future exploration activities of the Company may be affected by a range of factors including
geological conditions, limitations on activities due to seasonal weather patterns, unanticipated
operational and technical difficulties, industrial and environmental accidents, native title process,
changing government regulations and many other factors beyond the control of the Company.
Resource estimation risk
An Inferred Mineral Resource estimate has been reported at the Chillagoe Gold Project. Resource
estimates are expressions of judgement based on knowledge, experience and industry practice.
Estimates of Mineral Resources that were valid when originally made may alter significantly when
new information or techniques become available or when commodity prices change.
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
8
In addition, by their very nature, Mineral Resource estimates are imprecise and depend on
interpretations which may prove to be inaccurate, and whilst the Company employs industry-
standard techniques including compliance with the JORC Code 2012 to reduce the resource
estimation risk, there is no assurance that this approach will alter the risk.
As further information becomes available through additional fieldwork and analysis, Mineral
Resource estimates may change. This may result in alterations to mining and development plans
which may in turn adversely affect the Company.
Whilst the Company intends to undertake exploration activities with the aim of expanding and
improving the classification of the existing Inferred Mineral Resource, no assurances can be given
that this will be successfully achieved. Even if a Mineral Resource is identified, no assurance can be
provided that this can be economically extracted.
Native title
There remains a risk that in the future, native title and/or registered native title claims may affect
the land the subject of the Tenements or in the vicinity.
The Company’s ability to renew ML20381 which expired on 31 March 2025 depends on it
negotiating and executing a native title agreement with the native title party. While the renewal
application has been lodged and the tenement remains in force during the renewal process there is
no guarantee that an agreement will be reached or that the terms of any agreement are reasonable
and do not cause undue financial loss or impede the Company’s objectives.
In relation to the Tenements, the existence of native title or native title claims over the area covered
by the Tenements (or a subsequent determination of native title over the area), will not impact the
rights or interests of the holder under the Tenements provided the Tenements have been validly
granted in accordance with the Native Title Act 1933 (Native Title Act).
However, if any Tenement was not validly granted in compliance with the Native Title Act, this may
have an adverse impact on the Company's activities. There is nothing in the Company's enquiries to
indicate that any of the Australian Tenements were not validly granted in accordance with the
Native Title Act.
Land access risk
Mining tenements are a limited form of tenure which can co-exist with, and overlap, other land
interests and rights, including private land, pastoral leases, government-owned land interests, public
reserves, State forests and conservation areas. In most instances, the Company’s ability to access
areas of the Tenements overlapping these interests and rights will require some form of consent or
agreement, which may or may not be given or may be given on conditions. This can cause delay
and/or increased costs for the Company. The Company will need to manage access on an ongoing
basis.
Compensation may be payable to the third parties in some instances, particularly in relation to
carrying out activities on private land. Any inability to obtain, or delays or costs in respect of
obtaining, necessary landowner or government consents or agreements, or delays or costs in
resolving conflicting third-party rights and compensation obligations, may adversely impact the
Company’s ability to carry out exploration or mining activities within the affected areas.
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
9
Tenement title
Interests in Tenements are governed by federal, state and provincial legislation and are evidenced by
the granting of licences. Each licence is for a specific term and carries with it annual expenditure and
reporting commitments, as well as other conditions requiring compliance, such as satisfaction of
statutory payments (including land taxes and statutory duties) and compliance with work programs
and public health and safety laws (further information on which is set out in the Solicitor's Tenement
Report as set out at Annexure B). Consequently, the Company could lose title to or its interest in
Tenements if licence conditions are not met or if insufficient funds are available to meet expenditure
commitments as and when they arise.
Tenements, once granted, are subject to periodic renewal. The Company notes that ML20381
expired on 31 March 2025 and a renewal application has been lodged to renew this Tenement.
ML20381 remains in force while the renewal application is processed. There is no guarantee that
current or future tenement renewals will be approved. Renewal of the term of a granted tenement
is at the discretion of the relevant government authority and may include additional or varied
expenditure or work commitments or compulsory relinquishment of the areas comprising the
Company’s projects. The imposition of new conditions or the inability to meet those conditions may
adversely affect the operations, financial position and/or performance of the Company.
Commodity Markets and Exchange Rate Risk
To the extent the Company is involved in mineral production, the revenue derived through the sale
of commodities may expose the potential income of the Company to commodity price and exchange
rate risks. The Company's projects are primarily prospective for gold. The prices of gold and other
minerals fluctuate widely and are affected by numerous factors beyond the control of the Company,
such as industrial and retail supply and demand, exchange rates, inflation rates, changes in global
economies, confidence in the global monetary system, forward sales by producers and speculators
as well as other global or regional political, social or economic events. Future serious price declines
in the market values of the minerals that the Company has exposure to, could cause the
development of, and eventually the commercial production from, the Company's projects to be
rendered uneconomic. Depending on the prices of commodities, the Company could be forced to
discontinue production or development and may lose its interest in, or may be forced to sell, some
of its properties. There is no assurance that, even as commercial quantities of gold and other base
metals are produced, a profitable market will exist for it.
General risks
The Company is subject to various general risks, including the following (among others):
a) market condition risk;
b) contractual risk;
c) force majeure risk;
d) unforeseen expenditure risk; and
e) climate change risk.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
Significant changes in the state of affairs of the Company during the financial year were:
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
10
a) the successful Initial Public Offering (IPO) and admission to the Official List of the Australian
Securities Exchange (ASX), with the Company's ordinary shares commencing trading on the
ASX. The IPO strengthened the Company's capital base, provided funding to support the
Company's growth strategy and increased its public profile and access to equity capital
markets.
b) the completion of the acquisition of Burlington Mining Pty Ltd for consideration comprising
2,250,000 fully paid ordinary shares in the Company, with a fair value of $427,500 at the
acquisition date. The acquisition was accounted for as an asset acquisition as Burlington
Mining did not meet the definition of a business under AASB 3 Business Combinations.
Accordingly, no goodwill was recognised, with the acquisition cost allocated to the
identifiable assets acquired and liabilities assumed, including the exploration and evaluation
assets acquired.
Other than the matters described above, there were no significant changes in the state of affairs of
the Company during the financial year.
LIKELY DEVELOPMENTS AND EXPECTED RESULTS OF OPERATIONS
The Group will continue to explore and develop its mining leases and exploration permits.
EVENTS AFTER REPORTING YEAR
Subsequent to the end of the reporting period, the Company issued 522,483 fully paid ordinary shares
pursuant to a drill-for-equity agreement as part consideration for drilling services provided to the
Company.
No other matters or circumstances have arisen since the end of the financial year which significantly
affected or could significantly affect the operations of the Group, the results of those operations or
the state of affairs of the Group in future financial years.
ENVIRONMENTAL REGULATION
The Group’s operations are subject to environmental and other regulations. The Group has a policy
of engaging appropriately experienced contractors and consultants to advise on and ensure
compliance with environmental regulations in respect of its exploration activities. The Group
monitors compliance with relevant legislation on a continuous basis and the Directors are not aware
of any compliance breaches up to the date of this report.
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
11
INFORMATION ON DIRECTORS
Ted Boulton B Eng
Non-Executive Director
Experience and expertise Edward (Ted) is a mining engineer with 27 years’ of experience in
mining operations, mine planning, mineral economics and mine
development. Ted is a founding partner and current Director of MEC
Mining, an engineering and consultancy firm specialising in mining
engineering, geology, mine approvals, ecology and geotechnical
engineering.
Ted is a competent person for estimating Ore Reserves under The JORC
Code 2012. Ted has been a Director of Green & Gold Minerals since
2018 and has managed the company and lead the exploration activities
during this time.
Other current Directorships None
Former listed Directorships
in the last 3 years
None
Special responsibilities None.
Interests in shares 7,899,229 ordinary shares.
Tony Bellas B Econ, Dip Ed, MBA, FCPA, FAICD, FGS (London)
Non-Executive Chair
Experience and expertise Tony has more than 40 years experience in both the government and
private sectors. Tony has previously held positions of CEO of Ergon
Energy and CS Energy and had a long career with Queensland Treasury
where he reached the position of Deputy Under Treasurer with
oversight of Fiscal Strategy, Office of Government Owned Corporations
and Office of State Revenue.
He has Fellow member status of the Geological Society of London, the
Australian Institute of Company Directors and CPAs Australia.
Other current Directorships Non-executive Director of NOVONIX Limited (ASX: NVX).
Non-executive Director of State Gas Limited (ASX: GAS).
Chairman of CS Energy.
Former listed Directorships
in the last 3 years
intelliHR Limited (ASX: IHR)(ceased 2023)
Special responsibilities Non-executive Chair
Interests in shares 4,322,654 ordinary shares.
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
12
Quentin Hill BSc , Grad Cert BA, MAIG
Managing Director
Experience and expertise Quentin is an experienced ASX managing director and geologist with
more than 30 years’ experience in exploration and development in
Australia. He has wide-ranging commodity experience including gold,
iron ore, coal and base metals. Quentin has a record of moving large
and visionary projects forward from conception to feasibility, leading
consultancies and improving performance.
Quentin has held technical positions with major miners, including seven
years with Delta Gold and Vale’s coal divisions and has overseen
project discovery, successful resource upgrades, product marketing
efforts and a pre-feasibility study.
Quentin is an experienced corporate and technical leader,
demonstrating expertise in protecting and creating value,
demonstrating feasibility, raising capital and securing strategic
investment.
Other current Directorships None.
Former listed Directorships
in the last 3 years
None.
Special responsibilities Managing Director.
Interests in shares 180,000 ordinary shares.
280,000 performance rights over ordinary shares
MEETINGS OF DIRECTORS
The number of meetings of the Company’s Board of Directors held during the year ended 30 June
2026, and the number of meetings attended by each Director were:
Full meetings of
Directors
A B
A Bellas 3 3
E Boulton 3 3
Q Hill 3 3
A = Number of meetings attended
B = Number of meetings held during the time the director held office during the year
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
13
REMUNERATION REPORT (AUDITED)
The Directors present the Green & Gold Minerals Limited 2026 Remuneration Report, outlining key
aspects of our remuneration policy and framework, and remuneration awarded this year.
The report is structured as follows:
(a) Key management personnel (KMP) covered in this report
(b) Remuneration policy and link to performance
(c) Elements of remuneration
(d) Link between remuneration and performance
(e) Remuneration expenses for executive KMP
(f) Contractual arrangements for executive KMP
(g) Non-executive Director arrangements
(h) Additional statutory information
(a) Key management personnel covered in this report
Executive Directors
Quentin Hill
Non-Executive Directors
A Bellas
E Boulton
Changes since the end of the reporting year
There have been no changes to KMP since the end of the financial year.
(b) Remuneration policy and link to performance
The role of a remuneration committee is performed by the full Board of Directors. The board reviews
and determines the remuneration policy and structure annually to ensure it remains aligned to
business needs and conforms with our remuneration principles.
The Board aims to ensure that remuneration practices are:
• competitive and reasonable, enabling the Company to attract and retain key talent
• aligned to the Company’s strategic and business objectives and the creation of shareholder
value
• transparent and easily understood, and
• align with shareholder interests and are acceptable to shareholders.
GREEN & GOLD MINERALS LIMITED
ACN 603 812 997
14
REMUNERATION REPORT (AUDITED) (CONTINUED)
(c) Elements of remuneration
(i) Fixed annual remuneration (‘FR’)
Executives receive their fixed remuneration as cash. FR is reviewed annually and is benchmarked
against market data for comparable roles in companies in a similar industry and with similar market
capitalisation. The board has the flexibility to take into account capability, experience, value to the
organisation and performance of the individual. The Company has not engaged an external
remuneration consultant during FY2026.
Superannuation is included in FR for executives.
(ii) Short term incentives
The Company has a short-term incentive (STI) arrangement in place for the Managing Director that
provides for a maximum cash award of $42,000 (prorated from admission to the ASX, 7 October 2025),
representing 15% of base salary, subject to the achievement of operational, cost, safety,
environmental and regulatory performance measures.
The performance measures and their respective weight
Share your feedback
Discover